FG Shuts First Niger Bridge For Two Weeks Over Emergency Repairs
FG Shuts First Niger Bridge For Two Weeks Over Emergency Repair
By Chibuzo Obidike
The Federal Government has announced the temporary closure of the First Niger Bridge in Onitsha, Anambra State, for urgent repairs and maintenance.
The bridge will be completely closed to traffic from Monday, September 7, to Monday, September 21, 2026.
The Federal Ministry of Works said the closure followed the deterioration of some sections of the bridge, including parts of the expansion joint steelworks, nuts and bolts on the stanchions and steel trusses, with some components reportedly removed by scavengers.

The State Controller of the Federal Ministry of Works, Anambra Field Headquarters, Engr. Timothy Emenike, disclosed this in a statement, saying the decision followed an inspection of the bridge by the Minister of Works, David Umahi, during his recent working visit to Anambra.
Umahi, who expressed concern over the condition of the bridge, directed the immediate commencement of emergency repairs to prevent further deterioration and ensure the safety of motorists.
The ministry said SKECC, the contractor handling the 20 kilometre section of the Onitsha Enugu Dual Carriageway, has been directed to carry out the emergency intervention.
The repair will include the removal of damaged asphalt and the laying of about 40mm new asphalt wearing course, alongside other structural and safety maintenance works.
The Federal Government will also install solar powered streetlights and CCTV cameras on the bridge to improve security and prevent the theft of critical bridge components.
During the closure, motorists have been advised to use alternative routes, particularly the Second Niger Bridge through Obosi towards Asaba and other destinations.
The ministry urged motorists to obey diversion signs, reduce speed around construction zones and avoid reckless overtaking, assuring that traffic control officers and safety measures will be deployed.
It said the repairs will be carried out during the day and at night to ensure completion within the scheduled two week closure period.
While acknowledging the likely inconvenience to motorists, businesses and residents, the ministry appealed for understanding and cooperation, stressing that the intervention is necessary to restore the First Niger Bridge to a safe and motorable condition.
